Hub Power-Down Instructions
If a hub ever needs to be down-powered. For example; if being moved to a different physical location or if instructed to do so by tech support, please follow these instructions:
- Apply a short press of the power button - do not hold the power button down.

- Monitor the LED on the power button.
- Wait for the LED on the power button to turn off.
- When the LED is off the hub is shut down.
A short press of the power button will then turn the hub back on, as evidenced by the LED turning on.

Notes
- Using the power button as described above does a safe shutdown and properly stops the services.
- Keri also recommends the use of a UPS (Uninterrupted Power Supply) to ensure the hub remains online if there is a power-outage on site.
Related Articles
Claim a KB Hub
1.0 Introduction The following steps explain how to add and claim a hub. When adding the hub you will associate it with the KB site. Once the hub has been successfully claimed the hub will be configured for the KB hardware type. Notes: A hub ...
Add a PXL Hub
1.0 Introduction The following steps explain how to add and claim a hub. When adding the hub you will associate it with the PXL site. Once the hub has been successfully claimed the hub will be configured for the PXL hardware type. Notes: Before ...
Setup a Hub
A Borealis hub acts as the communication bridge between the access control hardware and cloud servers. IMPORTANT NOTES: - The hub MUST be added to a DHCP-enabled network with an active internet connection. The Borealis hub requires a DHCP-assigned IP ...
Claim a Standard NXT Hub
Introduction The following steps explain how to add and claim a Standard NXT hub. When adding the hub you will associate it with the NXT site. Once the hub has been successfully claimed the hub will be configured for the NXT hardware type. Notes: At ...
Hub Management Improvements
1.0 Introduction The Hub Management Improvements introduces a range of powerful new features designed to enhance control, efficiency, and visibility across hubs. Key enhancements include new options for restarting services, resetting hubs, and ...